Two installers can both quote a “6.6 kW system” yet deliver different panel models, different inverters, thinner wiring, weaker protection and very different after-sales support. The cheapest quote often looks cheapest only because items are missing. This checklist covers exactly what to verify, line by line, before you sign a solar installation contract in Pakistan.

Compare the full scope, not the headline price

Installers do not all use the same quotation format. One may quote a turnkey job — equipment, structure, cabling, protection, earthing, labour, transport, commissioning and net metering assistance — while another quotes equipment only and adds the rest later. Before comparing prices, ask every installer to mark which items are included, excluded or optional against the same equipment list. A panel rate from the per-watt price guide is not comparable with a complete installed quotation.

Panels: demand the exact model code

A serious quotation never says just “550W panels” or “Tier 1 panels”. It should name the manufacturer, exact model number, wattage, cell technology and quantity — e.g. 12 × 585W = 7,020W, or 7.02 kW DC. Ask for the datasheet and check module efficiency, product warranty versus performance warranty, and the temperature coefficient, which matters in Pakistani summers. The model code also lets you verify the panel is genuine rather than counterfeit.

Inverter: model, type and DC-to-AC ratio

“5 kW hybrid inverter” is not a specification. Ask for the brand, exact model, rated AC output, maximum PV input, MPPT voltage range, number of MPPT trackers, battery compatibility and warranty period. Confirm the inverter type — on-grid, hybrid or off-grid — because only the right type will do what you expect during load-shedding: a grid-tied inverter without battery support shuts down in an outage even in bright sunshine.

Get DC and AC capacities separately, then divide panel capacity by inverter AC capacity (a 7.7 kW array on a 6 kW inverter gives about 1.28). Oversizing the array is normal — but the installer should confirm in writing that it stays within the inverter’s voltage, current and capacity limits.

Batteries and backup: usable energy, not just a name

For hybrid systems, get the battery brand, model, chemistry, nominal capacity, usable capacity (after depth of discharge), voltage and cycle rating. A battery quoted as “10 kWh” may only deliver around 9 kWh of usable energy, and its discharge power limits how many appliances can run at once. Reject statements like “this gives 10 hours of backup” — backup time depends entirely on your load. Ask for estimated runtime at specific load levels, check it with our battery backup time method, and decide in advance which circuits will actually receive backup.

Know your size before you compare

Work out the system size your home actually needs first, then judge quotations against it.

Size your system

Structure, wiring, protection and earthing

The mounting structure holds your investment through storms and summer heat. Ask about material, thickness, galvanisation, fasteners and anchoring — “premium structure” means nothing without specifications. On wiring, confirm DC cable size and that it is solar-rated (UV-resistant, double-insulated), plus AC cable size and the manufacturer of both.

Electrical protection must appear as named items: DC isolators, string fuses, DC and AC surge protection devices, breakers and changeover equipment. Ask how many earth connections are included, how the structure is bonded, and whether testing is done. In Pakistan’s grid conditions, with monsoon surges, proper earthing and surge protection are safety essentials. Do not confuse a surge protection device with a full lightning protection system — that is separate engineering if needed.

Labour, waterproofing, transport and net metering

Confirm labour, testing and commissioning are included, and ask how panels reach the roof — crane or roof-lifting charges sometimes appear later as extras. Where mounts penetrate your concrete roof, get written responsibility for waterproofing and what happens if leakage occurs.

Unpack “net metering included”: does it cover application preparation, inspection support, utility coordination and follow-up — and which government or utility fees stay your responsibility? Our net metering application guide explains the process; also confirm the design meets current DISCO requirements.

Warranties, payment terms and substitutions

Panels, inverter, battery, structure and workmanship each carry separate warranties with their own duration, claim process and conditions. Ask who honours each warranty, where claims are submitted, and who pays transport and labour for replacements. A long warranty is only useful if it can actually be claimed locally.

Tie every payment to a milestone: a modest deposit, payment on equipment delivery, and final payment only after installation, testing and commissioning. Be cautious of contracts demanding most of the money upfront. Confirm all equipment is new (keep serial numbers, invoices and datasheets), and that any substitution of a quoted model requires your written approval — never an installer-side downgrade.

Quotation red flags

  • No exact panel or inverter model codes — just wattages.
  • A much lower price with thinner or missing items (protection, earthing, structure specs).
  • Savings or generation promises with no documented calculation.
  • Vague warranty language (“long warranty”) with no named provider.
  • Most of the payment due before equipment delivery.
  • No site survey of your actual roof, shading and electrical system.
  • Important commitments left verbal — if it is not written down, it is hard to enforce later.

Choose the right inverter first

On-grid, hybrid or off-grid — see which inverter type fits your loads and backup needs.

Inverter buying guide

Frequently asked questions

How many quotations should I get? Three is a practical minimum from established installers. Fewer gives you no basis for comparison; many more produces confusion, because every installer formats quotations differently.

Is a high DC-to-AC ratio a problem? Not automatically — panels rarely produce their rated output continuously. What matters is that the array stays within the inverter’s maximum voltage, current and permitted capacity limits, confirmed in writing.

Should the quotation include a generation estimate? Ideally yes — an annual kWh estimate based on system size, location, orientation, tilt, shading and losses. Ask how the figure was calculated rather than judging installers purely on who promises the highest.

What documents should I keep after installation? Serial and model numbers of all major equipment, purchase invoices, datasheets, warranty terms, manuals, shutdown instructions and commissioning records — everything needed for warranty claims years later.

15 Responses